Project Description
The scope of work consisted of designing an 18-inch gas pipeline in the Cernambi and Lula NE oil fields. The main activities included:
- Design basis;
- Pipe / soil interaction;
- Pipeline route design, drawings and alignment sheets;
- Pipeline expansion;
- Freespan;
- Bottom roughness;
- Themomechanical;
- Operational fatigue;
- Integral buckle arrestors design and drawings
- Rigid Jumper Design;
- Jumpers General Arrangement, Isometric, MTO and Weight Report;
- Data Sheet for 18in Lula-NE – Cernambi Pipeline.
Seven Seas’ role in the projects:
- proposal preparation,
- project implementation,
- management and technical coordination and
- execution of technical activities.
Client: Genesis Energies
Final client: Saipem