Project Description
São Marcos Bay Terminal
Pipeline feasibility study
The scope of this service is related to the preliminary studies to support Tenenge in the preparation of its technical proposal and cost estimate regarding the submarine stretch of the São Marcos Bay Terminal gas pipeline, with the alternative with 2730m in length being considered.
Deliverables:
- Evaluation of route alternatives and definition of the route base case;
- Preliminary definitions of installation methods;
- Pre-dimensioning of the pipeline;
- Elaboration of a descriptive memorial of the preliminary solution.
Client: Tenenge
Year: 2022
TGMA Bay Terminal
Pipeline feasibility study
The scope of this service is related to preliminary studies to support Tenenge in the preparation of its technical proposal and cost estimate for the subsea stretch of the TGMA Gas Pipeline.
Deliverables:
- Evaluation of route alternatives and definition of the route base case;
- Preliminary definitions of installation methods;
- Pre-dimensioning of the pipeline;
- Elaboration of a descriptive memorial of the preliminary solution.
Client: Tenenge
Year: 2022