Project Description

São Marcos Bay Terminal

Pipeline feasibility study

The scope of this service is related to the preliminary studies to support Tenenge in the preparation of its technical proposal and cost estimate regarding the submarine stretch of the São Marcos Bay Terminal gas pipeline, with the alternative with 2730m in length being considered.

Deliverables:

  • Evaluation of route alternatives and definition of the route base case;
  • Preliminary definitions of installation methods;
  • Pre-dimensioning of the pipeline;
  • Elaboration of a descriptive memorial of the preliminary solution.

Client: Tenenge
Year: 2022

TGMA Bay Terminal

Pipeline feasibility study

The scope of this service is related to preliminary studies to support Tenenge in the preparation of its technical proposal and cost estimate for the subsea stretch of the TGMA Gas Pipeline.

Deliverables:

  • Evaluation of route alternatives and definition of the route base case;
  • Preliminary definitions of installation methods;
  • Pre-dimensioning of the pipeline;
  • Elaboration of a descriptive memorial of the preliminary solution.

Client: Tenenge
Year: 2022

Contact us

Get in touch

Enquires can be directed to our email.
Contact us