Project Description

Pipeline study

The scope of this service is related to the support studies for the execution of tie-ins at both ends of the gas pipeline during the installation phase.

Deliverables

  • Model elaboration to simulate the pipeline tie-in on the directional hole side and on the operational platform side;
  • Analysis in the time domain simulating the necessary maneuvers to execute the tie-in of the concreted column with the column already positioned inside the directional hole;
  • Analysis in the time domain simulating the necessary maneuvers to execute the tie-in of the concrete column with the spools of arrival on the operational platform;
  • Assessment of loads and resources used;
  • Elaboration of sketches/schematics with recommendations and proposals if necessary.

Client: Tenenge
Year: 2022

Contact us

Get in touch

Enquires can be directed to our email.
Contact us