Project Description

The scope of the study consisted of the implementation of a project  to install a 20-inch gas pipeline (Enhanced Retap 20″) from the deployment project of the underwater network in the Billings dam, for COMGÁS in São Paulo, and the main activities are described below:

  • Ramp configuration for launching
  • Surface tow – 20 inches pipeline
  • Spacing of the mooring blocks – 20-inch pipeline
  • Lateral lifting for surface tie-in – 20-inch pipeline
  • Lowering the pipe string onto the seabed – 20-inch pipeline
  • Mooring system analysis
  • Installation pulling head
  • Basic Design Consistency Analysis

Seven Seas’ role in the projects:

  • proposal preparation,
  • project implementation,
  • management and technical coordination and
  • execution of technical activities.

Client: Genesis Energies
Final client: Azevedo Travassos