Project Description

The scope of work consisted of designing an 18-inch gas pipeline in the Cernambi and Lula NE oil fields. The main activities included:

  • Design basis;
  • Pipe / soil interaction;
  • Pipeline route design, drawings and alignment sheets;
  • Pipeline expansion;
  • Freespan;
  • Bottom roughness;
  • Themomechanical;
  • Operational fatigue;
  • Integral buckle arrestors design and drawings
  • Rigid Jumper Design;
  • Jumpers General Arrangement, Isometric, MTO and Weight Report;
  • Data Sheet for 18in Lula-NE – Cernambi Pipeline.

Seven Seas’ role in the projects:

  • proposal preparation,
  • project implementation,
  • management and technical coordination and
  • execution of technical activities.

Client: Genesis Energies
Final client: Saipem

Contact us

Get in touch

Enquires can be directed to our email.
Contact us