Project Description

Riser Interference Analysis

The scope of work consisted of providing a riser interference analysis to evaluate the adequacy of the riser configurations for  Búzios 2, 3, and 4 Fields, Sépia, Berbigão, Atapu, Lula Alto, Lula Extremo Sul

Peregrino Field

Engineering analyses of the tie-back system between WHP-C and existing WHP-A:

2-off 10 ¾ inch OD Rigid Production lines, 2x14km

1-off 12 ¾ inch OD Rigid Water Inj. line, 14km (internally coated wet paint epoxy)

  • On-bottom stability
  • Thermomechanical analysis
  • Spool design
  • Fatigue analysis
  • Installation

Seven Seas’ role in the projects:

  • proposal preparation,
  • project implementation,
  • management and technical coordination and
  • execution of technical activities.

Client: Genesis Energies
Final client: TFMC