Project Description
Riser Interference Analysis
The scope of work consisted of providing a riser interference analysis to evaluate the adequacy of the riser configurations for Búzios 2, 3, and 4 Fields, Sépia, Berbigão, Atapu, Lula Alto, Lula Extremo Sul
Peregrino Field
Engineering analyses of the tie-back system between WHP-C and existing WHP-A:
2-off 10 ¾ inch OD Rigid Production lines, 2x14km
1-off 12 ¾ inch OD Rigid Water Inj. line, 14km (internally coated wet paint epoxy)
- On-bottom stability
- Thermomechanical analysis
- Spool design
- Fatigue analysis
- Installation
Seven Seas’ role in the projects:
- proposal preparation,
- project implementation,
- management and technical coordination and
- execution of technical activities.
Client: Genesis Energies
Final client: TFMC